White City, Oregon, Boiler Inspection Services Solicitation Base Year + Four Option Years
Department of Veterans Affairs / 260-Network Contract Office 20 (36C260) White City, Oregon
Project details
- Listing type
- Open bid
- Bid / solicitation #
- 36C26026Q0977
- Agency
- Department of Veterans Affairs / 260-Network Contract Office 20 (36C260)
- Agency type
- Federal
- Location
- White City, Oregon
- Trade / category
- HVAC
- NAICS
- 561210
- Notice type
- Solicitation
- Set-aside / requirements
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- Due date
- at 5:00 PM PT
- None listed in the notice
About this job
What the job is
Inspect boilers and tanks at the VA clinic in White City, Oregon. Contract has one base year plus four option years.
Work included
- Inspect three 250HP low pressure gas and oil fired boilers
- Do Type A internal and external boiler inspections
- Do Type C external boiler inspection under steam pressure
- Witness and sign boiler safety device checklist
- Inspect one deaerator feed water tank in option years 1 and 3
- Inspect one heat recovery tank in option years 1 and 3
- Inspect one condensate tank and one bottom blow tank in option years 1 and 3
Where
White City, OR, 97503
Key dates
- Base year: 11/1/2026 to 10/31/2027
- Option year 1: 11/1/2027 to 10/31/2028
- Option year 2: 11/1/2028 to 10/31/2029
- Option year 3: 11/1/2029 to 10/31/2030
- Option year 4: 11/1/2030 to 10/31/2031
What you need
- Certified inspector must be present during NDT test
Good to know
- Inspections scheduled at the discretion of the Boiler Plant Lead
Plain-language summary of the agency’s description. Always check the full description and the bid documents below.
Full original description
White City, Oregon, Boiler Inspection Services Solicitation Base Year + Four Option Years The objective of this solicitation is to provide VA Southern Oregon Rehabilitation Center and Clinics (VA SORCC) with Boiler Plant Inspection Services. The resulting contract should be for one base year and four options years as follows: Base Year: 11/1/2026 to 10/31/2027. Option Year 1: 11/1/2027 to 10/31/2028 Option Year 2: 11/1/2028 to 10/31/2029 Option Year 3: 11/1/2029 to 10/31/2030 Option Year 4: 11/1/2030 to 10/31/2031 Details: The VA SORCC has three heating boilers, each rated at 250HP operating at low pressure (<15 psi), gas and oiled fired. Yearly state inspections are required on all three boilers, one deaerator/ feed water tank, one heat recovery tank, one condensate tank, and one bottom blow tank. SPECIFIC REQUIREMENTS: Contractor to furnish labor, personnel, materials and equipment to perform inspections on the following. (3) Three heating boilers, each rated at 250HP (operating pressure <15psi), gas and oil fired. (1) One deaerator/feed water tank (Option Year 1 and 3 only) Perform a non-destructive test (Option Year 3 only) A certified inspector must be present during the NDT Test in order for the NDT test to be valid. (1) One heat recovery tank (Option Year 1 and 3 only) (1) One condensate tank (Option Year 1 and 3 only) (1) One bottom blow tank (Option Year 1 and 3 only) Inspections to include a TYPE A Internal and External inspection and a TYPE C External inspection under steam pressure for each boiler. The contractor shall witness and sign a checklist of boiler safety devises as per VA-SORCC testing procedures during the external operational inspection and shall provide a written inspection report upon completion of each inspection to Facilities Management Service. The checklist of required safety devises to be tested will be available to the contractor The inspections are to be scheduled anytime throughout the term of the contract at the discretion of the Boiler Plant Lead. Why an Inspector Must Be Present Legal Compliance: Without an inspectors presence and approval, the NDT cannot be considered valid for regulatory purposes. Safety Verification: The inspector confirms that the test is conducted according to recognized standards (e.g., ASME, NBIC) and that any defects are properly documented. Certification: The inspectors signature or approval is required on the Certificate of Inspection or NDT report, which is necessary for the boiler to remain in service.
Bid documents (3 files)
- Attachment-2-Wage-Determinations-oregon-County-of-Jackson-2015-5571-Revision-30-Dated-08-27-2026.pdf PDF · 43 KB
- PWS-White-City-Boiler-Inspection-Services-Final.doc DOC · 53 KB
- S02-White-City-Boiler-Inspections-Solicitation-36C26026Q0977-FINAL.pdf PDF · 480 KB
Sign up to view and download these documents. Sign up to view Log in
Documents
Solicitation documents, specifications and any addenda are part of this bid.