Seal Coat – FM 1849, Brown County (Brownwood District)
Texas Department of Transportation – Brownwood District Brown County, Texas
Project details
- Listing type
- Open bid
- Estimated value
- $8,974,111
- Agency
- Texas Department of Transportation – Brownwood District
- Bid / solicitation #
- F 2027(157)
- Agency type
- State
- Location
- Brown County, Texas
- Trade / category
- Paving & Roadwork
- NAICS
- Not listed
- Notice type
- Invitation for Bids
- Set-aside / requirements
- None listed in the notice
- Posted
- Due date
- at 1:00 PM CT
- None listed in the notice
About this job
What the job is
Seal coat work on FM 1849 in Brown County. Job has 63 working days.
Work included
- Place 582 CY aggregate type PB grade 4 modified
- Install 539 each work zone pavement marking short term tabs type Y-2
- Place 526 each reflective pavement markers type II-A-A
- Eliminate 48 LF existing pavement markings and markers 24 inch
Where
FM 1849, Brown County, TX
Good to know
- Working days: 63
Plain-language summary of the agency’s description. Always check the full description.
Full original description
Statewide Let letting – Seal Coat. Control-section-job 1777-03-013, Brownwood District, Brown County, highway FM 1849.
Bid type: Low Bid. Working days: 63. Proposal guarantee: $100000.
Major bid items:
• Aggr (ty-pb Gr-4 Mod) — 582.0 CY
• WK ZN Pav MRK SHT Term (tab)ty Y-2 — 539.0 EA
• Refl Pav Mrkr TY Ii-a-a — 526.0 EA
• Re PM TY Ii (W) 24" (SLD) — 48.0 LF
• Re PM TY Ii (Y)6"(BRK)(020 Mil) — 3320.0 LF
• Re PM TY Ii (Y)6"(SLD)(020 Mil) — 21170.0 LF
• Elim Ext PM & Mrks (24") — 48.0 LF
• Asph (ac-20-5TR) — 98.0 TON
Documents
Solicitation documents, specifications and any addenda are part of this bid.