Routine Maintenance Project – IH0020, Taylor County (Abilene District)
Texas Department of Transportation – Abilene District Taylor County, Texas
Project details
- Listing type
- Open bid
- Estimated value
- $983,600
- Agency
- Texas Department of Transportation – Abilene District
- Bid / solicitation #
- RMC - A00222998
- Agency type
- State
- Location
- Taylor County, Texas
- Trade / category
- Paving & Roadwork
- NAICS
- Not listed
- Notice type
- Invitation for Bids
- Set-aside / requirements
- None listed in the notice
- Posted
- Due date
- at 10:00 AM CT
- None listed in the notice
About this job
What the job is
Routine maintenance on IH0020 in Taylor County.
Work included
- Use TMA stationary for 335 days
- Replace curved rail 400 LF
- Replace W-beam rail 9,000 LF
- Replace thrie-beam rail 300 LF
Where
Taylor County, TX on IH0020
Good to know
- Contract length: 365 working days
Plain-language summary of the agency’s description. Always check the full description.
Full original description
Local District Let letting – Routine Maintenance Project - Sealed. Control-section-job 6505-06-001, Abilene District, Taylor County, highway IH0020.
Bid type: Low Bid. Working days: 365. Proposal guarantee: $20000.
Major bid items:
• Tma (stationary) — 335.0 DAY
• Replace Downstream Anchor Terminal — 14.0 EA
• Replace Guardrail End Treatment System — 120.0 EA
• Replace Curved Rail — 400.0 LF
• Replace W-beam Rail — 9000.0 LF
• Replace Thrie-beam Rail — 300.0 LF
Documents
Solicitation documents, specifications and any addenda are part of this bid.