Paving & RoadworkClosedOpen bidState

Overlay – US 277, Haskell County (Abilene District)

Texas Department of Transportation – Abilene District Haskell County, Texas

Closed: at 1:00 PM CT

Project details

Listing type
Open bid
Estimated value
$7,519,837
Agency
Texas Department of Transportation – Abilene District
Bid / solicitation #
C 157-4-58
Agency type
State
Location
Haskell County, Texas
Trade / category
Paving & Roadwork
NAICS
Not listed
Notice type
Invitation for Bids
Set-aside / requirements
None listed in the notice
Posted
Due date
at 1:00 PM CT
None listed in the notice

About this job

What the job is

Overlay job on US 277 in Haskell County. It includes asphalt work, pavement repair, and guardrail fixes.

Work included

  • Place 9,727 TON D-GR HMA type-D asphalt
  • Place 21,298 TON stone-matrix asphalt
  • Apply 28,206 GAL tack coat
  • Repair flexible pavement structure 4 inch for 20,062 SY
  • Mill rumble strips on asphalt shoulder for 122,905 LF
  • Install and remove guardrail and end treatments

Where

Haskell County, TX on US 277

Good to know

  • Working days: 90

Plain-language summary of the agency’s description. Always check the full description.

Full original description

Statewide Let letting – Overlay. Control-section-job 0157-04-058, Abilene District, Haskell County, highway US 277.
Bid type: Low Bid. Working days: 90. Proposal guarantee: $100000.
Major bid items:
• Backfill (TY A) — 615.0 STA
• D-GR Hma TY-D Sac-b PG70-22 — 9727.0 TON
• Tack Coat — 28206.0 GAL
• Stone-mtrx-asph Sma-d Sac-a PG76-22 — 21298.0 TON
• Flexible Pavement Structure REPAIR(4") — 20062.0 SY
• Plane Asph Conc PAV(0" to 1") — 3738.0 SY
• Plane Asph Conc PAV(0" to 2") — 3738.0 SY
• Plane Asph Conc PAV(1") — 158258.0 SY
• Drill Shaft (24 In) — 94.0 LF
• Riprap (mow STRIP)(4 In) — 107.0 CY
• Cleaning and Sealing Exist Joints (CL3) — 616.0 LF
• Cleaning and Sealing Exist Joints (CL7) — 388.0 LF
• Retrofit Rail (TY T631) — 1104.0 LF
• Tma (stationary) — 91.0 DAY
• Tma (mobile Operation) — 42.0 DAY
• Mill Rumble Strips (asphalt) (shldr) — 122905.0 LF
• MTL W-beam GD Fen (tim Post) — 2900.0 LF
• MTL Beam GD Fen Trans (thrie-beam) — 2.0 EA
• Downstream Anchor Terminal Section — 11.0 EA
• MTL BM GD Fen Trans (non - SYM) — 2.0 EA
• MTL W - Beam GD Fen (low Fill Culvert) — 186.0 LF
• MTL BM GD Fen Trans (anchor Plate) — 11.0 EA
• Connector Plate for Thrie Beam — 2.0 EA
• Remove Metal Beam Guard Fence — 1750.0 LF
• Remove Terminal Anchor Section — 4.0 EA
• RM MTL BM GD Fence Trans (thrie-beam) — 4.0 EA
• Guardrail End Treatment (install) — 11.0 EA
• Guardrail End Treatment (remove) — 4.0 EA
• Aluminum Signs (TY G) — 479.0 SF
• In SM RD SN Sup&am TY10BWG(1)SA(P) — 147.0 EA

Documents

Solicitation documents, specifications and any addenda are part of this bid.