Network Infrastructure & Internal Connections: Wireless Access Points
Groton-dunstable Reg SCH Dist Groton, Massachusetts
Project details
- Listing type
- Open bid
- Bid / solicitation #
- 270001224
- Agency
- Groton-dunstable Reg SCH Dist
- Agency type
- School District
- Location
- Groton, Massachusetts
- Trade / category
- Audio/Visual & Low Voltage
- NAICS
- Not listed
- Notice type
- Solicitation
- Set-aside / requirements
- None listed in the notice
- Posted
- Due date
- None listed in the notice
About this job
What the job is
Network Infrastructure & Internal Connections: Wireless Access Points. This is for the school district's five-year replacement cycle.
Work included
- Supply 85 standard classroom wireless access points
- Supply 5 high-density gymnasium wireless access points
- Provide five-year warranty on all access points
- Include all software licenses and cloud support
- Include mounting brackets and hardware
Where
Groton-Dunstable Regional High School
Key dates
- Bids considered through: 2026-10-26
Good to know
- This is for funding year 2027
- Must be Extreme Wireless or equivalent
- Must work with existing Extreme cloud system
Plain-language summary of the agency’s description. Always check the full description and the bid documents below.
Full original description
Competitive bid for internal connections / network equipment and installation for Groton-dunstable Reg SCH Dist (School District, 5 eligible entities), funding year 2027.
Requested services:
• Internal Connections – Wireless Access Points and Necessary Software and Licenses (qty 90 Each)
As part of the ongoing infrastructure upgrades within the Groton-Dunstable Regional School District, reliable wireless internet access is essential to support students, teachers, and staff connecting to district technology resources and the internet throughout our schools.The District has historically followed an approximately five-year wireless access point replacement cycle, including associated hardware, software, licensing, warranty, and support. For the upcoming funding year, the District intends to replace 90 wireless access points as part of this lifecycle replacement at the Groton-Dunstable Regional High School.The District is seeking 90 Extreme Wireless access points, or equivalent, that are compatible with the District's existing Extreme Wireless infrastructure and cloud management environment. The proposed solution shall include the following:- 85 classroom/standard-density access points, such as the Extreme AP4020 or equivalent.- 5 high-density gymnasium access points, such as the Extreme AP5020 or equivalent.- Access points shall support Wi-Fi 6E or newer technology, including operation across the 2.4 GHz, 5 GHz, and 6 GHz bands.- Standard access points shall provide a minimum 2x2:2 radio configuration with software-defined/programable radios capable of supporting the 2.4 GHz, 5 GHz, and 6 GHz bands concurrently or through configurable operating modes. The Extreme AP4020 provides three 2x2:2 radios across these bands.- High-density access points shall provide a minimum 4x4:4 tri-radio configuration supporting the 2.4 GHz, 5 GHz, and 6 GHz bands. The Extreme AP5020 provides 4x4:4 radios across all three bands and is designed for high-density environments such as schools and large gathering spaces.- The access points shall support cloud-based management and integration with the District's existing wireless management environment.- The solution shall include a five-year warranty and applicable software/cloud licensing and support for the access points.- Mounting brackets and associated hardware required for installation shall be included.- Access points shall support the District's existing Ethernet and Power over Ethernet infrastructure, including 802.3at or better, as applicable to the proposed equipment.The proposed equipment shall be current-generation hardware and shall provide an upgrade path for continued wireless infrastructure support.Replacing this critical network hardware will continue to support instructional and operational technology, including student Chromebooks and staff laptops, tablets, interactive displays, mobile devices, and other network-connected equipment.
ITT72
Bids must be considered through 2026-10-26; the applicant may sign a contract on or after that date.
Bid documents (1 file)
- 22605910-USAC_FCC_FORM_470_APPLICATION_270001224_CERTIFIED.pdf PDF · 25 KB
Sign up to view and download these documents. Sign up to view Log in
Documents
Solicitation documents, specifications and any addenda are part of this bid.