Audio/Visual & Low VoltageClosedOpen bidSchool District

Network Infrastructure & Internal Connections: Cabling, Uninterruptable Power Supply/Battery Backup, Racks

Mendocino Unif School District Mendocino, California

Closed:

Project details

Listing type
Open bid
Bid / solicitation #
270001142
Agency
Mendocino Unif School District
Agency type
School District
Location
Mendocino, California
Trade / category
Audio/Visual & Low Voltage
NAICS
Not listed
Notice type
Solicitation
Set-aside / requirements
None listed in the notice
Posted
Due date
None listed in the notice

About this job

What the job is

Supply and install network cabling, racks, and battery backup systems for a school district.

Work included

  • Install 6,000 feet of cabling
  • Install 2,000 feet of cabling
  • Supply 11 uninterruptable power supplies with software and licenses
  • Provide basic maintenance for 11 uninterruptable power supplies
  • Supply 4 racks
  • Relocate existing main distribution frame at high school
  • Replace Cat 5 cabling with Cat 6 cabling

Where

Mendocino High School and Mendocino K-8 campus

Key dates

  • Bids due: 2026-10-22

Plain-language summary of the agency’s description. Always check the full description and the bid documents below.

Full original description

Competitive bid for internal connections / network equipment and installation for Mendocino Unif School District (School District, 7 eligible entities), funding year 2027.
Requested services:
• Internal Connections – Cabling (qty 6000 Feet)
• Internal Connections – Uninterruptable Power Supply/Battery Backup and Necessary Software and Licenses (qty 11 Each)
• Basic Maintenance of Internal Connections – Uninterruptable Power Supply/Battery Backup (qty 11 Each)
• Internal Connections – Cabling (qty 2000 Feet)
• Internal Connections – Racks (qty 4 Each)
11 Uninterrupted Power Supplies as specified in RFP. Relocation of existing MDF at Mendocino High School as specified in RFP. Recabling at Mendocino Community High School rooms at Mendocino High School and Mendocino K-8 campus. Recabling from Cat 5 to Cat 6 cabling.
Direct communications with District personnel during the Form 470/RFP process is prohibited. Prospective service providers that ignore this prohibition are subject to disqualification. Direct communications between existing vendors and District personnel to discuss project inititate prior to the issuance of this Form 470/RFP does not consitute a violation of the previously stated prohibition.
Bids must be considered through 2026-10-22; the applicant may sign a contract on or after that date.

Bid documents (4 files)

  • 22593797-Mendocino-Re.Cabling-Projects-2027.2028.pdf PDF · 36 KB
  • 22593803-Mendocino-MDF-Relocation-2027.2028.pdf PDF · 35 KB
  • 22593809-Mendocino-UPS-Equipment-2027.2028.pdf PDF · 40 KB
  • 22593924-USAC_FCC_FORM_470_APPLICATION_270001142_CERTIFIED.pdf PDF · 25 KB

Sign up to view and download these documents. Sign up to view Log in

Documents

Solicitation documents, specifications and any addenda are part of this bid.