Audio/Visual & Low VoltageClosedOpen bidSchool District

Network Infrastructure & Internal Connections: Switches, Uninterruptable Power Supply/Battery Backup

Fulton School District 58 Fulton, Missouri

Closed:

Project details

Listing type
Open bid
Bid / solicitation #
270000949
Agency
Fulton School District 58
Agency type
School District
Location
Fulton, Missouri
Trade / category
Audio/Visual & Low Voltage
NAICS
Not listed
Notice type
Solicitation
Set-aside / requirements
None listed in the notice
Posted
Due date
None listed in the notice

About this job

What the job is

Also supply UPS battery backups with software. For Fulton School District 58.

Work included

  • Supply 7 switches with software and licenses
  • Install the 7 switches
  • Supply 7 uninterruptable power supplies with software and licenses
  • Supply basic maintenance for the 7 switches
  • Supply basic maintenance for the 7 UPS units

Where

Fulton, Missouri

Key dates

  • Bids due: 2026-10-26

Plain-language summary of the agency’s description. Always check the full description and the bid documents below.

Full original description

Competitive bid for internal connections / network equipment and installation for Fulton School District 58 (School District, 9 eligible entities), funding year 2027.
Requested services:
• Basic Maintenance of Internal Connections – Switches (qty 7 Each)
• Internal Connections – Uninterruptable Power Supply/Battery Backup and Necessary Software and Licenses (qty 7 Each)
• Basic Maintenance of Internal Connections – Uninterruptable Power Supply/Battery Backup (qty 7 Each)
• Basic Maintenance of Internal Connections – Uninterruptable Power Supply/Battery Backup (qty 7 Each)
• Basic Maintenance of Internal Connections – Switches (qty 7 Each)
• Internal Connections – Switches and Necessary Software and Licenses (qty 7 Each)
• Internal Connections – Switches and Necessary Software and Licenses (qty 7 Each)
• Internal Connections – Uninterruptable Power Supply/Battery Backup and Necessary Software and Licenses (qty 7 Each)
Fulton SD 58 is seeking proposals for Uninterruptable Power Supply/Battery Backup, Switches, and Necessary Software and Licenses. The district is seeking installation only on the Switches. The district is not requesting installation for the UPS being sought.
SPAM and/or robotic responses will not be considered valid responses and will be disqualified from considerationPlease refer to the RFP attached for project specifications.
Bids must be considered through 2026-10-26; the applicant may sign a contract on or after that date.

Bid documents (3 files)

  • 22604113-FLT27RFP-03-UPS-SWITCHES.docx DOCX · 17 KB
  • 22740949-FLT27RFP-03-UPS-SWITCHES-QA-ADDENDUM.docx DOCX · 25 KB
  • 22740970-USAC_FCC_FORM_470_APPLICATION_270000949_CERTIFIED.pdf PDF · 26 KB

Sign up to view and download these documents. Sign up to view Log in

Documents

Solicitation documents, specifications and any addenda are part of this bid.