Audio/Visual & Low VoltageClosedOpen bidSchool District

Network Infrastructure & Internal Connections: Racks, Antennas, Connectors, and Related Components, Cabling

Michigan Center School District Michigan CTR, Michigan

Closed:

Project details

Listing type
Open bid
Bid / solicitation #
270002121
Agency
Michigan Center School District
Agency type
School District
Location
Michigan CTR, Michigan
Trade / category
Audio/Visual & Low Voltage
NAICS
Not listed
Notice type
Solicitation
Set-aside / requirements
None listed in the notice
Posted
Due date
None listed in the notice

About this job

What the job is

Upgrade network cabinet at Michigan Center High School.

Work included

  • Remove current wall mounted cabinet in A128 science classroom
  • Replace with new cabinet of same size 23W x 36H x 27D 22U
  • Reterminate and dress all cabling as needed
  • Install raceway boxes cable tray and J-hooks
  • Perform data cabling terminations
  • Install optical fiber and terminations
  • Provide equipment racks and cabinets

Where

Michigan Center High School (Michigan CTR, Michigan)

Good to know

  • Prices must be all-inclusive for complete installation

Plain-language summary of the agency’s description. Always check the full description and the bid documents below.

Full original description

Competitive bid for internal connections / network equipment and installation for Michigan Center School District (School District, 3 eligible entities), funding year 2027.
Requested services:
• Internal Connections – Racks (qty 1 Each)
• Internal Connections – Antennas, Connectors, and Related Components (qty 200 Each)
• Internal Connections – Cabling (qty 100 Feet)
Jackson County Intermediate School District, on behalf of Michigan Center School District is soliciting bids to upgrade a network cabinet.Prices quoted shall be all-inclusive and represent complete installation at the site indicated in the attached specifications. The Vendor shall be responsible for all parts, labor, and all other associated apparatus necessary to completely install, test, and turnover for acceptance to the Customer the project detailed herein. The building that the district is looking for replacement in are as follows: Michigan Center High School. Requested project includes: remove the current wall mounted cabinet in A128 (Science Classroom) and replace with a cabinet of the same size. Reterminate and dress all cabling as needed. Size of existing cabinet: 23W x 36H x 27D, 22U.The Vendor shall provide equipment, materials, labor, and services to provide data distribution system including, but not limited to:1. Raceway, boxes, cable tray and similar cable supporting devices. (J-hooks)2. Data cabling terminations.3. Optical fiber and terminations.4. Telecommunications outlets.5. Terminal blocks/cross-connect systems and fire-retardant mounting board. Equipment racks and cabinets.7. System testing.8.
Bids must be considered through 2026-11-12; the applicant may sign a contract on or after that date.

Bid documents (2 files)

  • 22761301-Michigan-Center-Network-Cabinet-Upgrade-2027-RFP.pdf PDF · 683 KB
  • 22762568-USAC_FCC_FORM_470_APPLICATION_270002121_CERTIFIED.pdf PDF · 26 KB

Sign up to view and download these documents. Sign up to view Log in

Documents

Solicitation documents, specifications and any addenda are part of this bid.