Water & UtilitiesClosedOpen bidCity/Municipal
IFB No. 27-13: Hale Street Drainage Project
City of Newburyport Newburyport, Massachusetts
Closed: at 11:00 AM ET
Project details
- Listing type
- Open bid
- Bid / solicitation #
- BD-27-1158-NBPT3-NBPT3-134457
- Agency
- City of Newburyport
- Agency type
- City/Municipal
- Location
- Newburyport, Massachusetts
- Trade / category
- Water & Utilities
- NAICS
- Not listed
- Notice type
- Not listed
- Set-aside / requirements
- None listed in the notice
- Posted
- Not listed
- Due date
- at 11:00 AM ET
- None listed in the notice
About this job
Work included
- Remove existing guardrail
- Do site preparation
- Install erosion controls
- Do earthwork
- Install precast concrete DMH
- Install 30 inch ADS drainpipe
- Place fill and riprap
Where
Newburyport, Massachusetts
Plain-language summary of the agency’s description. Always check the full description.
Full original description
Scope of Work for the Hale Street Drainage Project includes but is not limited to: removal of the existing guardrail, site preparation, installation of erosion controls, earthwork, installation of precast concrete DMH, 30â?? ADS drainpipe, fill, and riprap as shown on plans, loaming and seeding all disturbed areas, and any potential add alternates as listed.
Documents
Solicitation documents, specifications and any addenda are part of this bid.