City of Raleigh, John Chavis Memorial Park – Phase 2 Aquatic Center
City of Raleigh Raleigh, North Carolina
Project details
- Listing type
- Open bid
- Bid / solicitation #
- 274-FY2027-CM-P05R
- Agency
- City of Raleigh
- Agency type
- City/Municipal
- Location
- Raleigh, North Carolina
- Trade / category
- Pools & Water Features
- NAICS
- Not listed
- Notice type
- Not listed
- Set-aside / requirements
- None listed in the notice
- Posted
- Due date
- at 2:00 PM ET
- None listed in the notice
About this job
What the job is
Build a new two-story indoor and outdoor aquatic center at John Chavis Memorial Park.
Work included
- Build 25,000 SF building with locker rooms and offices
- Install 3,160 SF indoor competition pool
- Install 1,400 SF indoor therapy pool
- Build 10,300 SF outdoor area with 4,600 SF activity pool
- Reconfigure parking and upgrade Heritage Plaza
- Repair stone bridge and connect to South Park Heritage Trail
Where
Raleigh, North Carolina
Plain-language summary of the agency’s description. Always check the full description.
Full original description
This project proposes the construction of a new two-story aquatic center as part of Phase 2 of the John Chavis Memorial Park Master Plan. The Phase 2 Aquatic Center project, located alongside the existing John Chavis Community Center and the historic Allan Herschell Carousel, includes approximately five acres of site development and construction of a new indoor/outdoor aquatic facility and Heritage Plaza. The aquatic center will include approximately 25,000 SF of mixed-use interior space consisting of assembly areas, locker rooms, administrative offices, mechanical and equipment rooms, storage, and other support spaces. Indoor aquatic amenities include a 3,160 SF competition/lap pool and a 1,400 SF therapy pool. The outdoor aquatic area will encompass approximately 10,300 SF and feature a 4,600 SF activity pool with a lazy river, vortex, water recreation area, and a two-story waterslide. The building's architectural design is highlighted by an overhead oval-shaped perforated metal "crown" that distinguishes the facility's roofline and references the park's historic carousel. The project also includes reconfiguration of site parking, upgrades to the Heritage Plaza with a historically inspired public art installation, repairs to the existing stone bridge, and new connections to the South Park Heritage Trail. The aquatic center will be a fully sprinklered, steel-framed structure with mixed assembly and business occupancies. The scope of work includes complete civil, structural, architectural, mechanical, electrical, plumbing, fire protection, and site utility systems to provide a modern, year-round aquatic facility that honors the historic legacy of John Chavis Memorial Park while serving the recreational and community needs of future generations.
Documents
Solicitation documents, specifications and any addenda are part of this bid.