Boca Tolls Data Center Construction – Toll Data Center (Palm Beach County)
Florida Department of Transportation – Turnpike Palm Beach, Florida
Closed: at 02:30 PM
Project details
- Listing type
- Open bid
- Bid / solicitation #
- E8X33
- Agency
- Florida Department of Transportation – Turnpike
- Agency type
- State
- Location
- Palm Beach, Florida
- Trade / category
- Paving & Roadwork
- NAICS
- Not listed
- Notice type
- Invitation for Bids
- Set-aside / requirements
- None listed in the notice
- Posted
- Due date
- at 02:30 PM
- None listed in the notice
About this job
What the job is
Replace two rooftop units at the Boca Tolls Data Center.
Work included
- Replace two direct expansion coil rooftop units
- Serve the UPS Room #140
- Perform turnkey replacement
Where
Palm Beach, Florida
Good to know
- Prequalification is not required
Plain-language summary of the agency’s description. Always check the full description.
Full original description
District Office Letting 08261020 (Turnpike Enterprise), proposal E8X33. The work specified in this Contract consists of providing all labor, materials, equipment and incidentals necessary to perform a turnkey replacement of existing two (2) direct expansion (DX) coil rooftop units serving the UPS Room #140 located at Boca Tolls Data Center, Florida's Turnpike Mainline, Exit 75. PREQUALIFICATION IS NOT REQUIRED.