Architecture & EngineeringSubcontract opportunityFederal

Provide Architecture and Engineering (a&e) Sope Creek Dam and Sibley Pond – Weir and Box Culvert Retrofit Design Chattahoochee River

National Park Service Atlanta, Georgia

Prime contract awarded to WSP Usa Solutions Inc

Project details

Listing type
Subcontract opportunity
Prime contractor (awardee)
WSP Usa Solutions Inc
Award date
Award amount
$296,645
Contract #
140P5126F0038
Awarding agency
National Park Service
Location
Atlanta, Georgia
Trade / category
Architecture & Engineering
NAICS
541330
Set-aside / requirements
None listed

About this job

What the job is

Provide architecture and engineering design for Sope Creek Dam and Sibley Pond weir and box culvert retrofit.

Work included

  • Design retrofit for Sope Creek Dam
  • Design weir retrofit at Sibley Pond
  • Design box culvert retrofit at Sibley Pond
  • Follow performance work statement
  • Use conceptual report from FY23

Where

Atlanta, Georgia

Plain-language summary of the agency’s description. Always check the full description.

Full original description

Provide Architecture and Engineering (a&e) Sope Creek Dam and Sibley Pond - Weir and Box Culvert Retrofit Design Chattahoochee River National Recreation Area (chat) in Accordance with Performance Work Statement and Conceptual Report (FY23) for CH

Prime contract 140P5126F0038 was awarded to WSP Usa Solutions Inc on Sep 23, 2026 for $296,645 by National Park Service. NAICS 541330 (engineering services). Product/service code C212 (architect and engineering- general: engineering drafting, not cad/cam). Place of performance: GA 30350.

About subcontract opportunities

This federal prime contract was recently awarded. Prime contractors often bring in local trade subcontractors and suppliers to perform the work.

Apply through GovernmentBids to be considered for subcontract work on this award.

Apply through GovernmentBidsStart 7-day free trialSign up free to apply