Paving & RoadworkClosedOpen bidState

TPK (SR 91) at Taft Vineland RD Intrchg (MP 253) Orange CTY (Orange County)

Florida Department of Transportation – Turnpike Orange County, Florida

Closed: at 02:30 PM

Project details

Listing type
Open bid
Bid / solicitation #
E8W51
Agency
Florida Department of Transportation – Turnpike
Agency type
State
Location
Orange County, Florida
Place of performance
Orange, FL
Trade / category
Paving & Roadwork
NAICS
Not listed
Notice type
Invitation for Bids
Set-aside / requirements
None listed in the notice
Posted
Due date
at 02:30 PM
None listed in the notice

About this job

What the job is

Build a new interchange at Florida Turnpike and Taft Vineland Road. Also widen Taft Vineland Road and do utility work.

Work included

  • Widen Taft Vineland Road from South Orange Blossom Trail to Florida Turnpike
  • Perform utility work along Taft Vineland Road

Where

Orange County, Florida

What you need

  • Contractor must be prequalified

Plain-language summary of the agency’s description. Always check the full description.

Full original description

District Office Letting 08261103 (Turnpike Enterprise), proposal E8W51. Work consists of providing all labor, materials, equipment and incidentals necessary for construction of a new interchange at Florida Turnpike (SR 91) and Taft Vineland Road in Orange County. The contract also includes widening of Taft Vineland Road from South Orange Blossom Trail to Florida Turnpike and utility work by highway contractor along Taft Vineland Road for Orange County Utilities and Orlando Utilities Commission (OUC). Acceptability of the evidence related to the two projects is at the sole discretion of the Department. Contractor must be prequalified.

Documents

Solicitation documents, specifications and any addenda are part of this bid.