Ponce De Leon Ops Maint – Remove and Replace Rpms (Holmes County)
Florida Department of Transportation – District 3 Holmes County, Florida
Project details
- Listing type
- Open bid
- Estimated value
- $150,000.00
- Agency
- Florida Department of Transportation – District 3
- Bid / solicitation #
- E3Z86-R0
- Agency type
- State
- Location
- Holmes County, Florida
- Place of performance
- Holmes, FL
- Trade / category
- Paving & Roadwork
- NAICS
- Not listed
- Notice type
- Invitation for Bids
- Set-aside / requirements
- None listed in the notice
- Posted
- Due date
- at 11:00 AM
- None listed in the notice
About this job
What the job is
Remove and replace reflective pavement markers on state highways in Holmes, Walton, and parts of Washington Counties. All markers removed must be replaced the same day.
Work included
- Remove existing reflective pavement markers
- Replace reflective pavement markers same workday
Where
Holmes, Walton, and portions of Washington Counties (Holmes County, Florida)
Good to know
- This is a work document-driven contract
- Quantities are estimates only
Plain-language summary of the agency’s description. Always check the full description.
Full original description
District Office Letting 03261022 (District 3), proposal E3Z86-R0. The Improvements under this Work Document-Driven Contract consist of the removal and replacement of existing reflective pavement markers, along various state highways in Walton, Holmes, and portions of Washington Counties. All reflective pavement markers removed shall be replaced in same workday. This contract has a budgetary estimate of $150,000.00. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Department estimated quantities and the Contractors bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder, however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. A Proposal Guaranty will not be required on indefinite quantity contracts, such as work document driven contracts, with a Departments advertised estimate amount of $150,000 or less regardless of the bid amount.
Documents
Solicitation documents, specifications and any addenda are part of this bid.