Paving & RoadworkClosedOpen bidState

Ponce De Leon Ops Maint – Remove and Replace Rpms (Holmes County)

Florida Department of Transportation – District 3 Holmes County, Florida

Closed: at 11:00 AM

Project details

Listing type
Open bid
Estimated value
$150,000.00
Agency
Florida Department of Transportation – District 3
Bid / solicitation #
E3Z86-R0
Agency type
State
Location
Holmes County, Florida
Place of performance
Holmes, FL
Trade / category
Paving & Roadwork
NAICS
Not listed
Notice type
Invitation for Bids
Set-aside / requirements
None listed in the notice
Posted
Due date
at 11:00 AM
None listed in the notice

About this job

What the job is

Remove and replace reflective pavement markers on state highways in Holmes, Walton, and parts of Washington Counties. All markers removed must be replaced the same day.

Work included

  • Remove existing reflective pavement markers
  • Replace reflective pavement markers same workday

Where

Holmes, Walton, and portions of Washington Counties (Holmes County, Florida)

Good to know

  • This is a work document-driven contract
  • Quantities are estimates only

Plain-language summary of the agency’s description. Always check the full description.

Full original description

District Office Letting 03261022 (District 3), proposal E3Z86-R0. The Improvements under this Work Document-Driven Contract consist of the removal and replacement of existing reflective pavement markers, along various state highways in Walton, Holmes, and portions of Washington Counties. All reflective pavement markers removed shall be replaced in same workday. This contract has a budgetary estimate of $150,000.00. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Department estimated quantities and the Contractors bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder, however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. A Proposal Guaranty will not be required on indefinite quantity contracts, such as work document driven contracts, with a Departments advertised estimate amount of $150,000 or less regardless of the bid amount.

Documents

Solicitation documents, specifications and any addenda are part of this bid.