Asphalt Resurfacing – Newburg Road (KY 1703) (Jefferson County)
Kentucky Transportation Cabinet Jefferson County, Kentucky
Project details
- Listing type
- Open bid
- Bid / solicitation #
- 262162
- Agency
- Kentucky Transportation Cabinet
- Agency type
- State
- Location
- Jefferson County, Kentucky
- Place of performance
- Jefferson, KY
- Trade / category
- Paving & Roadwork
- NAICS
- Not listed
- Notice type
- Invitation for Bids
- Set-aside / requirements
- None listed in the notice
- Posted
- Not listed
- Due date
- None listed in the notice
About this job
What the job is
Asphalt resurfacing on three road sections in Jefferson County.
Work included
- Resurface Newburg Road from KY 2052 north for 0.51 miles
- Resurface Newburg Road from Thousand Oaks Drive north for 2.29 miles
- Resurface Preston Highway from 0.026 miles south of Okalona Ter north for 1.02 miles
Where
Jefferson County, KY
Key dates
- Bids due: 2026-10-22
Good to know
- DBE goal is 0.00%
Plain-language summary of the agency’s description. Always check the full description.
Full original description
Highway letting 2026-10-22, call 208, contract 262162. STP 6000(381) Jefferson County (KY 61, KY 1703) the Dbe Participation Goal Is 0.00%. Jefferson County STP 6000(381) : Newburg Road (KY 1703) (MP 0.000) Begin at a Concrete Joint at KY 2052 Extending North to 0.016 Miles North of East Indian Trail (MP 0.513), a Distance of 0.51 Miles. Asphalt Resurfacing. SYP No. 05-20074.00. Jefferson County STP 6000(381) : Newburg Road (KY 1703) (MP 2.468) Begin at Thousand Oaks Drive Extending North to Us 60A (MP 4.765), a Distance of 2.29 Miles. Asphalt Resurfacing. SYP No. 05-20074.00. Jefferson County STP 6000(381) : Preston HWY (KY 61) (MP 3.800) Begin at an Asphalt Joint 0.026 Miles South of Okalona Ter Extending North to Northern Ditch Bridge (MP 4.824), a Distance of 1.02 Miles. Asphalt Resurfacing. SYP No. 05-20074.00.
Documents
Solicitation documents, specifications and any addenda are part of this bid.