Paving & RoadworkClosedOpen bidState
Grade & Drain with Asphalt Surface – I-64/I-75 Northern Split Ramp Replace Existing I-75 SB Bridg (Fayette County)
Kentucky Transportation Cabinet Fayette County, Kentucky
Closed:
Project details
- Listing type
- Open bid
- Bid / solicitation #
- 261520
- Agency
- Kentucky Transportation Cabinet
- Agency type
- State
- Location
- Fayette County, Kentucky
- Place of performance
- Fayette, KY
- Trade / category
- Paving & Roadwork
- NAICS
- Not listed
- Notice type
- Invitation for Bids
- Set-aside / requirements
- None listed in the notice
- Posted
- Not listed
- Due date
- None listed in the notice
About this job
What the job is
Replace I-75 southbound bridge and approaches. Grade, drain, and add asphalt surface on 1.20 miles of road.
Work included
- Replace existing I-75 southbound bridge
Where
Fayette, KY (Fayette County, Kentucky)
Key dates
- Bids due: 2026-10-22
Good to know
- DBE goal 0.00 percent
Plain-language summary of the agency’s description. Always check the full description.
Full original description
Highway letting 2026-10-22, call 101, contract 261520. Nhpp 0754 (069) : I-64/I-75 Northern Split Ramp Replace Existing I-75 SB Bridge (034B00085N) and Approaches to Reduce Congestion on I-64/I-75 From Northern Split to Newtown Pike, a Distance of 1.20 Miles. Grade & Drain with Asphalt Surface. SYP No. 07-08909.15. the Dbe Participation Goal Is 0.00%.
Documents
Solicitation documents, specifications and any addenda are part of this bid.