Fog Seal approximately 5 miles of I-59 from the Forrest County Line to the Forrest County Line, Fog Seal approximately 2.8 miles of I-59 from the US 98 Bypass to the Lamar County Line, & Replace approximately 4.9 miles of OGFC on I-59 from the Lamar
Mississippi Department of Transportation Forrest County, Mississippi
Project details
- Listing type
- Open bid
- Bid / solicitation #
- IM-0059-01(145) / 110076301
- Agency
- Mississippi Department of Transportation
- Agency type
- State
- Location
- Forrest County, Mississippi
- Trade / category
- Paving & Roadwork
- NAICS
- Not listed
- Notice type
- Not listed
- Set-aside / requirements
- None listed in the notice
- Posted
- Not listed
- Due date
- None listed in the notice
About this job
What the job is
Replace 4.9 miles of OGFC on I-59.
Work included
- Fog seal 5 miles of I-59 in Forrest County
- Fog seal 2.8 miles of I-59 from US 98 Bypass to Lamar County Line
- Replace 4.9 miles of OGFC on I-59 from Lamar County Line to US 98 East
Where
I-59 in Lamar and Forrest Counties (Forrest County, Mississippi)
Plain-language summary of the agency’s description. Always check the full description.
Full original description
Fog Seal approximately 5 miles of I-59 from the Forrest County Line to the Forrest County Line, Fog Seal approximately 2.8 miles of I-59 from the US 98 Bypass to the Lamar County Line, & Replace approximately 4.9 miles of OGFC on I-59 from the Lamar County Line to US 98 East, known as Federal Aid Project Nos. IM-0059-01(145) / 110076301, IM-0059-01(144) / 110077301 & IM-0059-01(143) / 110078301 in Lamar & Forrest Counties.
Documents
Solicitation documents, specifications and any addenda are part of this bid.