Intersection & Operational Imprv – US 180, Parker County (Fort Worth District)
Texas Department of Transportation – Fort Worth District Parker County, Texas
Project details
- Listing type
- Open bid
- Estimated value
- $632,887
- Agency
- Texas Department of Transportation – Fort Worth District
- Bid / solicitation #
- STP 2027(100)HES
- Agency type
- State
- Location
- Parker County, Texas
- Trade / category
- Paving & Roadwork
- NAICS
- Not listed
- Notice type
- Invitation for Bids
- Set-aside / requirements
- None listed in the notice
- Posted
- Due date
- at 1:00 PM CT
- None listed in the notice
About this job
What the job is
Paving and roadwork at an intersection on US 180 in Parker County. The job takes 33 working days.
Work included
- Excavate roadway 182 CY
- Build embankment 275 CY
- Place aggregate 51 CY
- Set up stationary TMA 46 days
- Set up mobile TMA 6 days
Where
Parker County, TX
Plain-language summary of the agency’s description. Always check the full description.
Full original description
Statewide Let letting – Intersection & Operational Imprv. Control-section-job 0008-02-078, Fort Worth District, Parker County, highway US 180.
Bid type: Low Bid. Working days: 33. Proposal guarantee: $13000.
Major bid items:
• Excav (roadway) — 182.0 CY
• Embank (fnl)(oc)(ty B) — 275.0 CY
• Aggr (TY-B, Gr-4)(SAC-B) — 51.0 CY
• Tma (stationary) — 46.0 DAY
• Tma (mobile Operation) — 6.0 DAY
• In SM RD SN Sup&am TY10BWG(1)SA(P) — 1.0 EA
• Remove SM RD SN Sup&am — 1.0 EA
• Instl Om Assm (om-2Z)(WFLX)GND(BI) — 1.0 EA
• WK ZN Pav MRK Non-remov (w)(arrow) — 2.0 EA
• WK ZN Pav MRK Non-remov(w)(word) — 2.0 EA
• WK ZN Pav MRK SHT Term (tab)ty W — 154.0 EA
• WK ZN Pav MRK SHT Term (tab)ty Y-2 — 49.0 EA
• Refl Pav MRK TY I (W)(ARROW)(100MIL) — 2.0 EA
• Refl Pav MRK TY I (W)(WORD)(100MIL) — 2.0 EA
• Refl Pav Mrkr TY I-c — 33.0 EA
• Prime Coat (ae-p) — 290.0 GAL
• Asph (crs-2) — 2224.0 GAL
• Tack Coat — 290.0 GAL
• Biodeg Erosn Cont Logs (instl) (12") — 20.0 LF
• Biodeg Erosn Cont Logs (remove) — 20.0 LF
• Mill Rumble Strips (asphalt) (shldr) — 1800.0 LF
• WK ZN Pav MRK Non-remov (W)6"(BRK) — 250.0 LF
• WK ZN Pav MRK Non-remov (W)6"(SLD) — 932.0 LF
• WK ZN Pav MRK Non-remov (W)8"(SLD) — 650.0 LF
• WK ZN Pav MRK Non-remov (W)24"(SLD) — 40.0 LF
• WK ZN Pav MRK Non-remov (Y)6"(SLD) — 976.0 LF
• Refl Pav MRK TY I (W)8"(SLD)(100MIL) — 650.0 LF
• Refl Pav MRK TY I (W)24"(SLD)(100MIL) — 40.0 LF
• All-wther PM TY I (W)6"(SLD)(100MIL) — 932.0 LF
• All-wther PM TY I (W)6"(BRK)(100MIL) — 250.0 LF
Documents
Solicitation documents, specifications and any addenda are part of this bid.