General ConstructionClosedOpen bidFederal

Tinker AFB 2026 Multiple Award Construction Contract (MACC)

Dept. of the Air Force / FA8137 Afsc Pzioc Tinker AFB, Oklahoma

Closed: at 1:00 PM CT

Project details

Listing type
Open bid
Bid / solicitation #
FA8137-26-R-0040
Agency
Dept. of the Air Force / FA8137 Afsc Pzioc
Agency type
Federal
Location
Tinker AFB, Oklahoma
Trade / category
General Construction
NAICS
236210
Notice type
Solicitation
Set-aside / requirements
Small Business Set Aside - Partial
Posted
Due date
at 1:00 PM CT
None listed in the notice

About this job

What the job is

This is a multiple award contract for general construction at Tinker Air Force Base. It covers sustainment, maintenance, repair, alteration, renovation, and minor construction projects.

Work included

  • Complete design to 100 percent level when required
  • Perform construction with limited design
  • Carry out construction only work using full design package
  • Provide testing services and quality control
  • Deliver complete usable end product

Where

Tinker AFB, OK, 73145

What you need

  • Small business size standard of $45 million

Good to know

  • Small business set-aside - partial
  • Preliminary documents will be 15 percent or greater design
  • Government provides statement of work and drawings for each task order
  • Contract length: one base period of five (5) years with one option period of five (5) years

Plain-language summary of the agency’s description. Always check the full description and the bid documents below.

Full original description

October 7, 2026 The government is still working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 28 October, 2026, while the government finalizes documents. September 23, 2026 The government is sitll working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 13 October, 2026, while the government finalizes documents. September 16, 2026 Complete RFI responses posted. The proposal due date will remain unchanged but the government will continue to monitor the need to extend. September 10, 2026 It was brought to the government's attention that previous solicitation amendments cannot be accessed. They now have been activated and are accessible. The government is still working to answer all RFIs. Some have already been answered, and the government is working to answer the rest. The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers to industry. August 19 2026: Please see amendment 0002 attached and an updated Section L. August 11 2026: 1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026. 2. The government is accepting RFIs until 21 August at 3PM EDT. If you have already sent your RFIs to the POCs you do not have to resubmit them.
THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma. The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals. Project execution methods will fall into one of the following classifications. The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract. The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed. These documents will be equivalent to a schematic 15% or greater design. When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government. Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project. This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted. The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project. These documents will be equivalent to a design submittal 35% to 65%. When awarded the TO the Contractor will complete any additional design efforts required by the project and produce a set of working documents for use during construction. Construction only method will include the Government providing 100% design package, including the SOW, drawings, specification, and any other documents as necessary to establish requirements for the work to be accomplished. When awarded the TO the Contractor shall commence with construction in accordance with the design and contract requirements. The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals necessary to provide a complete useable end product as specified in the TO/project documents. The North American Industry Classification System (NAICS) Code is 236210, Industrial Building Construction with a small business size standard of $45 million. The MACC will be executed for one base period of five (5) years with one option period of five (5) years. The Government will negotiate equitable adjustments resulting from change orders in the shortest practicable time. Approximately 120 days are required to definitize equitable adjustments associated with change orders for construction. Offerors are strongly encouraged to review their informaiton in SAM to validate that it is current and up to date. DISCLAIMER: The information being requested does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result of replying to this notice. This notice should not be construed as a commitment by the Government for any purpose.

Bid documents (41 files)

  • Solicitation-Amendment-FA813726R00400005.pdf PDF · 1.1 MB
  • Solicitation-Amendment-FA813726R00400005-SF-30.pdf PDF · 376 KB
  • Solicitation-Amendment-FA813726R00400004.pdf PDF · 1.1 MB
  • Solicitation-Amendment-FA813726R00400004-SF-30.pdf PDF · 375 KB
  • Questions-and-Answers-16-Sep-2026.xlsx XLSX · 55 KB
  • Solicitation-FA813726R0040.pdf PDF · 1.2 MB
  • Solicitation-Amendment-FA813726R00400001.pdf PDF · 1.1 MB
  • Solicitation-Amendment-FA813726R00400001-SF-30.pdf PDF · 382 KB
  • Solicitation-Amendment-FA813726R00400002.pdf PDF · 1.1 MB
  • Solicitation-Amendment-FA813726R00400002-SF-30.pdf PDF · 381 KB
  • Solicitation-Amendment-FA813726R00400003-SF-30.pdf PDF · 377 KB
  • Solicitation-Amendment-FA813726R00400003.pdf PDF · 1.1 MB
  • FA813726R0040-Questions-and-Answers-CAO-25-Aug-2026.xlsx XLSX · 45 KB
  • Attachment_2__Section_L-18-Aug-26.pdf PDF · 573 KB
  • Attachment_3_Section_M_Evaluation_Criteria-29-July-26.pdf PDF · 208 KB
  • Attachment_2b_Appendix_B_Work_Sample_Cover_Sheet4May26.docx DOCX · 31 KB
  • Attachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix-4-May-26.xlsx XLSX · 84 KB
  • Attachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix-4-May-26.xlsx XLSX · 88 KB
  • Attachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix-06-May-26.xlsx XLSX · 82 KB
  • Attachment_2a_Appendix_A_Corporate_Relationships_and_Structures4May26.xlsx XLSX · 15 KB
  • Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix-06-May-26.xlsx XLSX · 84 KB
  • 001-CDRL-Organization-Chart-Signed.pdf PDF · 144 KB
  • 004-CDRL-Data-Rights.pdf PDF · 99 KB
  • 003-CDRL-TO-Progress-Mtg-Signed.pdf PDF · 144 KB
  • 002-CDRL-Quaterly-Progress-Mtg-Signed.pdf PDF · 144 KB
  • ERDCITL_TR12-1_r2.pdf PDF · 3.4 MB
  • ERDCITL_TR12-6_r6.pdf PDF · 1.5 MB
  • tinkerafb_INRMP_App-G.pdf PDF · 4.6 MB
  • afi91-202_afmcsup.pdf PDF · 2.7 MB
  • tinkerafbi13-204.pdf PDF · 1.8 MB
  • TAFB_SOP_outages_v2.pdf PDF · 473 KB
  • tinkerafbi21-100.pdf PDF · 213 KB
  • dodio-2000.16v1_afi10-245-o.pdf PDF · 37 KB
  • tinkerafb_INRMP_App-E.pdf PDF · 225 KB
  • afi48-104.pdf PDF · 317 KB
  • Appendix-C-UMRL.pdf PDF · 686 KB
  • TAFB-Facility-Standards.pdf PDF · 10.1 MB
  • B2-TAFB-Technical-Requirements-Div-02-48.pdf PDF · 9.8 MB
  • Appendix-B1-TAFB-General-Requirements-Div-00-01.pdf PDF · 9.8 MB
  • Appendix-A-Abbreviations.pdf PDF · 60 KB
  • Attachment-1-Statement-of-Work-Jun26.pdf PDF · 1 MB

Sign up to view and download these documents. Sign up to view Log in

Documents

Solicitation documents, specifications and any addenda are part of this bid.