Water & UtilitiesClosedOpen bidCity/Municipal

IFB No. 27-13: Hale Street Drainage Project

City of Newburyport Newburyport, Massachusetts

Closed: at 11:00 AM ET

Project details

Listing type
Open bid
Bid / solicitation #
BD-27-1158-NBPT3-NBPT3-134457
Agency
City of Newburyport
Agency type
City/Municipal
Location
Newburyport, Massachusetts
Trade / category
Water & Utilities
NAICS
Not listed
Notice type
Not listed
Set-aside / requirements
None listed in the notice
Posted
Not listed
Due date
at 11:00 AM ET
None listed in the notice

About this job

Work included

  • Remove existing guardrail
  • Do site preparation
  • Install erosion controls
  • Do earthwork
  • Install precast concrete DMH
  • Install 30 inch ADS drainpipe
  • Place fill and riprap

Where

Newburyport, Massachusetts

Plain-language summary of the agency’s description. Always check the full description.

Full original description

Scope of Work for the Hale Street Drainage Project includes but is not limited to: removal of the existing guardrail, site preparation, installation of erosion controls, earthwork, installation of precast concrete DMH, 30â?? ADS drainpipe, fill, and riprap as shown on plans, loaming and seeding all disturbed areas, and any potential add alternates as listed.

Documents

Solicitation documents, specifications and any addenda are part of this bid.