ConcreteClosedOpen bidCity/Municipal

Sidewalk, Curb, and Gutter Repairs Program Fiscal Year 2023-24 SB1

City of Stockton Stockton, California

Closed: at 2:00 PM PT

Project details

Listing type
Open bid
Bid / solicitation #
WD24004
Agency
City of Stockton
Agency type
City/Municipal
Location
Stockton, California
Trade / category
Concrete
NAICS
238110
Notice type
Invitation to bid / request for proposals
Set-aside / requirements
None listed in the notice
Posted
Due date
at 2:00 PM PT
None listed in the notice

About this job

What the job is

Remove and replace curb, gutter, and sidewalk damaged by tree roots. Work at about 90 spots all over the city.

Work included

  • Provide safety and traffic control
  • Remove old concrete and base material
  • Install new driveways, sidewalks, curb and gutter
  • Place asphalt concrete and Portland cement concrete pavement
  • Preserve existing survey monuments
  • Notify USA 72 hours before digging

Where

Various locations citywide (Stockton, California)

Plain-language summary of the agency’s description. Always check the full description and the bid documents below.

Full original description

SIDEWALK, CURB, AND GUTTER REPAIRS PROGRAM FISCAL YEAR 2023-24 SB1, PROJECT NO. WD24004. The project includes removal and replacement of curb, gutter, and sidewalk damaged by City tree roots at various locations citywide.

The work herein includes the bid (various locations citywide) 1. Curb, Gutter, Sidewalk, Driveway removal and installation (approximately 90 locations, not all locations have curb & gutter work). All projects shall consist of providing project safety and traffic control, removal of existing concrete and aggregate base, and installation of driveways, flat work, sidewalk, curb, gutter, asphalt concrete and Portland cement concrete pavements and other work as needed and directed by the Engineer. Scope of Work consists of the following: a) Preservation of existing survey monuments (e.g. chiseled cross, survey iron pipe, etc.) per section 5-1.09. Notify USA at least 72 hours prior to start of removal work. Excavation and embankment as required to reconstruct removed improvements. Saw cut, removal and replacement of curb, gutter, sidewalk, AC pavement (1’ wide), curb returns, driveway and concrete flat work as specified. Cutting and removing all tree roots under damaged concrete. Establish proper flow line elevations and positive drainage for curb/gutter reconstruction ensuring appropriate drainage. Adjust catch basin elevation to ensure proper drainage. Construct concrete driveway approach, including saw cutting, removal and replacement of PCC and AC pavement as specified. Remove and replace additional AC pavement (8” deep) not included in various bid items.

Bid documents (7 files)

  • WD24004-Bid-Forms.pdf PDF · 285 KB
  • WD24004-Location-List.pdf PDF · 71 KB
  • WD24004-Notice-Inviting-Bids.pdf PDF · 78 KB
  • WD24004-Notice-to-Contractors.pdf PDF · 109 KB
  • WD24004-Vicinity-Map.pdf PDF · 5.9 MB
  • WD24004-Instructions-to-Bidders.pdf PDF · 10.7 MB
  • WD24004_Special-Provisions.pdf PDF · 426 KB

Sign up to view and download these documents. Sign up to view Log in

Documents

Solicitation documents, specifications and any addenda are part of this bid.