Welding & Metal FabricationClosedOpen bidFederal

Airfield Blast Shield

Dept. of the Air Force / FA4661 7 Cons CD Dyess AFB, Texas

Closed: at 10:00 AM CT

Project details

Listing type
Open bid
Bid / solicitation #
FA466126R0008
Agency
Dept. of the Air Force / FA4661 7 Cons CD
Agency type
Federal
Location
Dyess AFB, Texas
Trade / category
Welding & Metal Fabrication
NAICS
238120
Notice type
Solicitation
Set-aside / requirements
Small Business Set Aside - Total
Posted
Due date
at 10:00 AM CT
None listed in the notice

About this job

What the job is

Fabricate and install new curved blast deflector fences for B1-B bombers at Dyess AFB.

Work included

  • Build structural frames from rolled shapes and punch holes
  • Install galvanized corrugated steel deflecting surface
  • Bolt all parts together on existing concrete
  • Use heat treated bolts for blast areas
  • Paint aircraft parking numbers on deflectors
  • Install 2 foot by 2 foot number signs 15 feet high

Where

Dyess AFB, TX 79607

Key dates

  • Bids due: 27 October 2026

Good to know

  • Small-business-only
  • Use Tye Gate for all access
  • Store materials in fenced laydown yard and restore area when done

Plain-language summary of the agency’s description. Always check the full description and the bid documents below.

Full original description

Amendment 0002 (16 Oct 2026) The purpose of this amendment is to: 1. 2. All other solicitation requirements remain unchanged and in full effect. Amendment 0001 (13 Oct 2026): The purpose of this amendment is to 1. Extend the Proposal Due Date to 27 October 2026. 2. All other solicitation requirements remain unchanged and in full effect. 1.1 PROJECT DESCRIPTION: 1.1.1 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s), and all applicable Federal, State and local regulations/codes. 2.1 GENERAL: 2.1.1 The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall be considered as the standard for this work. The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blast fence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. 2.1.2 Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access. 2.1.3 Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area, the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. The approved laydown yard will be provided at the pre-construction meeting. 2.1.4 Contractor shall provide material submittals for all materials & products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size. 2.1.5 Work is located in a restricted area. The schedule should include start/end times for each day, crew sizes, and work locations. 3.1 BLAST DEFLECTOR CONTRUCTION: 3.1.1 Structural frames which support the deflecting surface will be of structural shapes, rolled, punches, and prefabricated for bolting together at site. Deflecting surface will be of galvanized corrugated steel with a minimum of 2 oz. zinc coating per Fed. Spec. WW-P-00405. Sheets shall have a section modulus of not less than 0.0163 inches curbed per inch and shall be of corrosion resistant material with yield point in 50,000 psi range. 3.1.2 All bolts subject to blast temperatures shall be of SAE 1038 steel, heat treated. All nuts, except on anchor bolts, shall be made of all-steel, self-locking type. 4.1 BLAST DEFLECTOR ANCHORAGE 4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16”. Lynnco "Epoxy-Locked" anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast deflectors. 5.1 BLAST DEFLECTOR ASSEMBLY: 5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing or burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer. 6.1 BLAST DEFLECTOR FINISH: 6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural members, parts, and corrugated metal will be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. 6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors. The Contactor shall provide a 2’x2’ number sign mounted 15’ above the concrete at the midpoint on the backside of the blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings. Tabulation must show the maximum pressure in psi, temperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of blast impingement on deflector. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to blast temperatures. 7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors may not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.

Bid documents (10 files)

  • FA466126R0008_Amendment0002_16Oct2026.pdf PDF · 192 KB
  • Blast-Shield-solicitation-questions-10-15-26.pdf PDF · 2.5 MB
  • FA466126R0008_Amendment0001_13Oct2026.pdf PDF · 290 KB
  • FA466126R0008-solicitation_Redacted.pdf PDF · 11.3 MB
  • Wage-Determination-Heavy.pdf PDF · 144 KB
  • FNWZ-25-0166-South-Apron-Blast-Shields_SoW_Redacted.pdf PDF · 5.7 MB
  • Q-and-A-Sheet.docx DOCX · 25 KB
  • Attachment-C-AF-Form-3065.pdf PDF · 992 KB
  • Attachment-B-Price-Schedule.pdf PDF · 75 KB
  • Attachment-C-AF-Form-3064.xlsx XLSX · 36 KB

Sign up to view and download these documents. Sign up to view Log in

Documents

Solicitation documents, specifications and any addenda are part of this bid.

Similar open bids